Today work continued on the groups PD3 ( GNY432C ). This vehicle looks better and better every week.
Work also has continued on the fleetline( JKG497F ) with more of the treadmaster being cut to replace the parts that had peeled up. Below is a video showing the cut treadmaster placed over the gaps in the floor. After the last few bits are cut, it will need to be glued down with treadmaster glue and the whole floor cleaned.
We are pleased to announce the arrival of a new bus at the depot. The Mecedes 711d Entered preservation on Saturday 23rd of January, having been donated by Stagecoach. We would like to thank Stagecoach for their generous donation.
With this being the first post of the new year, I hope everyone had a good Christmas and new year. At the depot work has continued on the groups Gardner engined Fleetline, with the bodywork getting some attention prior to repainting. Some of the new treadmaster has also been glued down to replace the pieces which had peeled back.
Below is a video showing a tour of the main area of the depot.